Land Use Watch: October 2026
October 24, 2026
The City of Virginia Beach Monthly Land Use Report for October 2026 includes, in Section 2, the Development Services Center’s Presubmittal, Comment Review, Inquiry Meeting Log and its DSC Site Plan Approvals (entries dated September 1, 2026 to September 30, 2026), and, in Section 3, the Planning Commission October 2026 Application Submittals. Below, all three tables are grouped by Council District, as the City printed them.
VBCCO meets with Planning staff each month after this report is released. Notes from that meeting will be added here.
At a glance
Council District
Meetings with the DSC
Site plans approved
Planning applications submitted
District 1
2
1
4
District 2
2
4
2
District 3
5
2
0
District 4
2
0
3
District 5
3
2
2
District 6
12
6
7
District 7
1
0
0
District 8
2
2
0
District 9
1
0
1
District 10
2
0
0
Total
32
17
19
What the terms mean
Meeting types, from the City’s key: I = Inquiry; PS = Presubmittal Meeting; CR = Comment Review.
Project descriptions and statuses are quoted from the City’s Accela records at the time this report was posted. Statuses change as a project moves through review; follow the record link for the current status. Inquiries usually have no DSC file number and no Accela record.
City review results come from the Processing Status on each Accela record: the record’s status now, the review result and its date, and each City department that has marked the plan “Comments” or “No Comments”, with the date. They are read from Accela every day for the two newest reports; the date read is shown with each record. Reviewer names are not shown.
Documents are listed as the City shows them on each Accela record. Each name links to its Accela “Document Details” page, which describes the file; it does not open the file. Some documents can be opened on Accela after a free account login. In VBCCO’s check on October 28, 2026, a City reviewer comment file could not be opened even after logging in. VBCCO does not have copies of these documents.
Site plan approvals, from the City’s footnote: “Projects associated with previous City Council land use approvals. All other projects are by-right development.” Below, each site plan is marked one way or the other.
Planning applications submitted, from Section 3 of the City’s report: “This list reflects the applications that were submitted to the Planning Department this month. It does not indicate or imply when an application will be scheduled for a public hearing. Please visit VirginiaBeach.gov/PC to review the applications scheduled for each month’s Planning Commission public hearing.” Application types, from the City’s key: AMD = Code Amendment; ALT = Alternative Compliance; CRZ = Conditional Rezoning; CUP = Conditional Use Permit; FVR = Floodplain Variance; MDC = Modification of Conditions; MDP = Modification of Proffers; MEV = Major Entertainment Venue Signs; NON = Expansion to a Nonconforming Use or Structure; PDH = Amendment/Modification to the PDH Land Use Plan; REZ = Rezoning; RGS = Roadside Guide Signs; STC = Street Closure; SVR = Subdivision Variance.
Planning applications filed after the October 2026 report
Applications the City has received since the last one listed in Section 3 of the October 2026 report (record 2026-PCCC-00198). The first, 2026-PCCC-00199, was filed October 7, 2026. They are not yet in a City report; each one moves into the report that lists it. Updated daily from the City’s Accela records (last checked October 30, 2026 8:15 AM). Void applications are not shown.
Record #
Application type
Project
Council District
Location
Filed
Status
2026-PCCC-00199
Conditional Use Permit
Mission Enterprises, LLC
5
501 VIRGINIA BEACH BLVD, 23451
October 7, 2026
Submitted
2026-PCCC-00200
Modification of Conditions
Sophia Ellis
6
523 20TH ST, 23451
October 16, 2026
In Review
2026-PCCC-00201
Conditional Use Permit
Martin Yu
6
304 28TH ST, 110, 23451
October 19, 2026
Submitted
2026-PCCC-00202
Conditional Use Permit
Autumn Fossett
3
443 DAUPHIN LN, 23452 532
October 25, 2026
Submitted
2026-PCCC-00204
Modification of Conditions
Ann Sagle
1
1212 CANDLEWOOD DR, 23464 582
October 28, 2026
Submitted
2026-PCCC-00205
Conditional Use Permit
Thomas G Davis and Nancy Rodio Davis
6
4005 ATLANTIC AVE, 118, 23451-2605
October 28, 2026
Submitted
What the City’s Accela records say
Mission Enterprises, LLC (501 VIRGINIA BEACH BLVD, 23451): “Mission Enterprises, LLC / Assembly Use in conjunction with the Esoteric Restaurant” Accela record 2026-PCCC-00199, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Sophia Ellis (523 20TH ST, 23451): “Sophia Ellis / Revision of the exception for alternative compliance filed 6/20/2018 regarding the section stating, “Each of the proposed Detached Houses shall not be used for any other principle use than one single-family dwelling.” The modification is requested to allow for short-term rental usage while maintaining the single-family dwelling requirement.” Accela record 2026-PCCC-00200, Modification of Conditions, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 26, 2026); Application Assignment: Assigned (October 26, 2026); Prepare App For Routing: Complete (October 26, 2026); Route App for Review: Complete (October 26, 2026); DSC Landscape Architect: No Response (October 26, 2026); Fire Marshal: Complete (October 29, 2026).
Martin Yu (304 28TH ST, 110, 23451): “Martin Yu / Applying for a conditional use permit to operate home as a short term rental. It will be professionally managed by Host my Home, a short term rental management company.” Accela record 2026-PCCC-00201, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Autumn Fossett (443 DAUPHIN LN, 23452 532): “Autumn Fossett / Roots & Sprouts is a small, home-based homeschool support and educational enrichment program intended to provide a nurturing, structured learning environment for children, with an emphasis on foundational academic skills, social development, and individualized instruction. / The proposed program will operate from my primary residence in Virginia Beach, Virginia. Enrollment will be limited to a maximum of four children from outside the household at any one time. The program is proposed to operate two days per week for three hours per day, for a total of six scheduled instructional hours per week. Hours of operation will be Tuesday and Wednesday 9:00am-12:00pm. The following years I plan to go up to a Monday, Tuesday, Wednesday, and Thursday program from 9:00am-12:00pm. / The program will be operated by the resident (property owner’s wife), with no additional employees planned. Parents will retain responsibility for their children’s home education, and Roots & Sprouts will provide supplemental educational instruction and support. / Instruction will take place within the existing residential structure. No new buildings, additions, exterior alterations, or changes to the exterior appearance of the property are proposed. The existing residential building materials and appearance will remain unchanged. / The program will be designed to minimize impacts on the surrounding residential neighborhood. Student arrivals and departures will be coordinated to reduce congestion, and families will be instructed to park in the driveway where space is available. No routine student parking on the street is intended. The program will not include outdoor commercial activities, retail sales, or amplified noise. / No prior City Council approvals, variance requests, or Chesapeake Bay Preservation Act requests are known to be associated with this proposal. If any additional approvals are determined to be necessary, I will follow the applicable City requirements. / I respectfully request consideration of a Conditional Use Permit to operate this small-scale educational support program as a home occupation while maintaining the residential character of the property and minimizing impacts on neighboring residences.” Accela record 2026-PCCC-00202, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Ann Sagle (1212 CANDLEWOOD DR, 23464 582): “Ann Sagle / Modifications to a Conditional Use Permit (Accela Record #2025-PCCC-00200 issued on April 22, 2026” Accela record 2026-PCCC-00204, Modification of Conditions, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Documents on the Accela record (4): CUP_Final.pdf (Disclosure Statement*, uploaded October 28, 2026); MOCA_Final.pdf (Application*, uploaded October 28, 2026); Supporting documentation.pdf (Site Plan, uploaded October 28, 2026); Randy Text Message.docx (Other, uploaded October 28, 2026): “Transcript of text conversation with the adjacent propery owner in support of the modification request”.
Thomas G Davis and Nancy Rodio Davis (4005 ATLANTIC AVE, 118, 23451-2605): “Thomas G Davis and Nancy Rodio Davis / Request to operate a studio short term rental.” Accela record 2026-PCCC-00205, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Documents on the Accela record (2): Disclosure Statement.pdf (Disclosure Statement*, uploaded October 28, 2026); Application.pdf (Application*, uploaded October 28, 2026).
District 1
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 3, 2026
Presubmittal Meeting
Ellenson Crossing
Indian Lakes Boulevard, GPIN 14668083600000, District 1
D09-023643-PM
Christopher Pocta, Wolcott Rivers, Gates
PJ Scully
September 18, 2026
Comment Review
Matney Subdivision
Gawain Court, District 1
B08-021830-CP
Tanner Praria, MSA, P.C.
Ronald Frink
What the City’s Accela records say
Ellenson Crossing (DSC file D09-023643-PM): “Ellenson Crossing / Ellenson Crossing is a proposed 46-unit, three-story, elevator-served community for adults aged 55 and older, serving individuals earning between 30% and 80% of the Area Median Income. We are requesting a Conditional Rezoning to remove the property from the existing land use plan and rezone the site to A-24 with proffers to allow for the development of attainable senior housing that supports independent living and aging in place for residents of Virginia Beach.” Accela record 2026-DSC-023643, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 10, 2026. Comments from 10 departments: Fire Marshal (September 3, 2026); Parks Planning Design Dev (September 10, 2026); Comprehensive Planning (September 8, 2026); Planning Admin Current (September 3, 2026); DSC Engineering (September 3, 2026); DSC Landscape Architect (September 3, 2026); DSC Project Coordinator (August 27, 2026); DSC PU Engineer (September 8, 2026); PU Engineering (August 28, 2026); PW Traffic Engineering (September 8, 2026). No comments from 2 departments: DSC Planner (September 8, 2026); Zoning (September 3, 2026). Other steps: Application Submittal: Received (August 24, 2026); Application Research: Complete (August 24, 2026); PM Submittal Review: Complete (August 25, 2026); Package Distribution: EDR Distribution (August 26, 2026).
Matney Subdivision (DSC file B08-021830-CP): “Avalon Glen N/F Matney Subdivision / Project is being constructed for a 13-lot single-family residential property.” Accela record 2025-DSC-021830, Subdivision Construction Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, October 21, 2026. Comments from 2 departments: DSC Engineering (October 20, 2026); DSC Planner (October 14, 2026). No comments from 14 departments: CGIS (September 3, 2025); Fire Marshal (March 5, 2026); Hampton Roads Sanitation District (July 9, 2026); Parks Landscape Management (January 6, 2026); Parks Planning Design Dev (January 6, 2026); Planning Admin Current (September 4, 2025); DSC Administrator (September 17, 2025); DSC Landscape Architect (December 30, 2025); DSC Project Coordinator (October 6, 2026); DSC PU Engineer (October 14, 2026); DSC Addressing (August 18, 2026); PU Engineering (July 14, 2026); PU Operations (September 2, 2025); PW Stormwater Eng Center (August 31, 2026). Other steps: Application Submittal: Resubmittal Received (October 27, 2026); Application Research: Complete (August 29, 2025); PM Submittal Review: Complete (October 28, 2026); Package Distribution: EDR Distribution (October 29, 2026); PW Traffic Engineering: Note (October 14, 2026).
Associated with previous City Council land use approvals
What the City’s Accela records say
Indian River Multi-Family (3037 & 3040 Coastal Breeze Loop 1121 & 1124 Sirocco Lane): “Indian River Multi-Family / 165 unit apartment complex in 4 buildings as approved to A-24 from prior rezoning.” Accela record 2025-DSC-022314, Site Plan, Multi Family, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 30, 2026. Comments from 1 department: DSC Planner (September 22, 2026). No comments from 12 departments: Fire Marshal (May 14, 2026); Hampton Roads Sanitation District (August 24, 2026); Parks Planning Design Dev (May 13, 2026); Planning Admin Current (March 6, 2026); DSC Engineering (September 8, 2026); DSC Landscape Architect (May 4, 2026); DSC Project Coordinator (September 22, 2026); DSC PU Engineer (May 14, 2026); DSC Addressing (April 30, 2026); PU Engineering (September 1, 2026); PW Traffic Engineering (September 30, 2026); Planning Admin CBPA (August 19, 2026). Other steps: Application Submittal: Resubmittal Received (September 21, 2026); Application Research: Complete (December 16, 2025); PM Submittal Review: Complete (September 22, 2026); Package Distribution: EDR Distribution (September 22, 2026); Final Utility Fee Sheet: Complete (September 30, 2026); Approval Letter: Letter Sent (September 30, 2026); Approval Stamping: Complete (September 30, 2026); Addressing: Complete (October 2, 2026).
Parcel directly south of 1100 Indian Lakes Boulevard
2026-PCCC-00194
Marchelle Coleman
Request to rezone 1.99 acres from PD-H1 to Conditional A-24 Apartment District for the development of up to 46 senior housing units.
Conditional Use Permit
Woda Cooper Development, Inc.
Parcel directly south of 1100 Indian Lakes Boulevard
2026-PCCC-00195
Marchelle Coleman
Request to construct senior housing community with up to 46 units.
Conditional Use Permit
Rebekkah Parker
1545 Stonemoss Court
2026-PCCC-00179
Arianna Low
Request to operate a family day-care home for up to 12 children.
Conditional Use Permit
Cellco Partnership d/b/a Verizon Wireless
1152 Indian Lakes Boulevard
2026-PCCC-00185
Shynae Howard
Request to construct and operate a 135-foot galvanized steel monopole communication tower.
What the City’s Accela records say
Woda Cooper Development, Inc. (Parcel directly south of 1100 Indian Lakes Boulevard): “Woda Cooper Development, Inc. / Ellenson Crossing is a proposed senior housing community for individuals aged 62 and older earning between 30% and 80% of the Area Median Income (AMI). The development will consist of 46 rental units in a three-story, elevator building, with a mix of one-bedroom and two-bedroom units designed to support independent living for older adults. / The building will be green certified through the use of energy-efficient and sustainable design features. The design will also feature resident amenities such as a community room, dog park, and grandparent room. The exterior architecture will incorporate a combination of brick and durable, low-maintenance materials that provide both visual appeal and long-term durability. / The property will be professionally managed with a full-time Community Manager and full-time Maintenance Technician to ensure high-quality operations, responsive maintenance, and resident services. On-site staff will be available Monday through Friday from 8:30 a.m. to 4:30 p.m. to assist residents and oversee day-to-day operations. Ellenson Crossing will provide much-needed affordable senior housing while offering residents a safe, attractive, and stable living environment.” Accela record 2026-PCCC-00194, Conditional Change of Zoning, zoning PDH1, proposed A-24 Apartment, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 19, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 20, 2026); DSC PU Engineer: Complete (October 15, 2026); Parks Planning Design Dev: No Response (October 28, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: No Response (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Woda Cooper Development, Inc. (Parcel directly south of 1100 Indian Lakes Boulevard): “Woda Cooper Development, Inc. / Ellenson Crossing is a proposed senior housing community for individuals aged 62 and older earning between 30% and 80% of the Area Median Income (AMI). The development will consist of 46 rental units in a three-story, elevator building, with a mix of one-bedroom and two-bedroom units designed to support independent living for older adults. The building will be green certified through the use of energy-efficient and sustainable design features. The design will also feature resident amenities such as a community room, dog park, and grandparent room. The exterior architecture will incorporate a combination of brick and durable, low-maintenance materials that provide both visual appeal and long-term durability. The property will be professionally managed with a full-time Community Manager and full-time Maintenance Technician to ensure high-quality operations, responsive maintenance, and resident services. On-site staff will be available Monday through Friday from 8:30 a.m. to 4:30 p.m. to assist residents and oversee day-to-day operations. Ellenson Crossing will provide much-needed affordable senior housing while offering residents a safe, attractive, and stable living environment.” Accela record 2026-PCCC-00195, Conditional Use Permit, use: Housing for Seniors and Disabled, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 19, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 20, 2026); DSC PU Engineer: Complete (October 20, 2026); Parks Planning Design Dev: No Response (October 27, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: No Response (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Rebekkah Parker (1545 Stonemoss Court): “Rebekkah Parker / I am requesting a Conditional Use Permit to operate a Virginia-licensed Family Day Home within my existing residence. / I currently operate as an active Family Child Care (FCC) provider under the United States Navy’s FCC program and have established my home childcare program in accordance with the requirements of that program. I am seeking to transition from the Navy FCC program to Virginia state licensure as a Family Day Home while continuing to provide high-quality, in-home childcare to local families. / My goal is to provide a safe, nurturing, and developmentally appropriate home environment where children are encouraged to learn, explore, build confidence, and reach important developmental milestones. The program will provide individualized attention and age-appropriate learning experiences while supporting children’s social, emotional, physical, and cognitive development. / The proposed Family Day Home will operate within my existing residence, with no proposed change to the residential character or structure of the property. The home will continue to serve as both my residence and the setting for the childcare program. The program will maintain a small, family-oriented environment that allows for attentive supervision, meaningful relationships, and individualized care for each child. / The purpose of this Conditional Use Permit is to obtain the necessary local approval to continue providing family childcare from my residence under Virginia’s state licensing requirements. / My home is 1,560 square feet with a fenced in backyard space of 180 square feet.” Accela record 2026-PCCC-00179, Conditional Use Permit, use: Child Daycare, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: No Response (October 14, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 14, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Cellco Partnership d/b/a Verizon Wireless (1152 Indian Lakes Boulevard): “Cellco Partnership d/b/a Verizon Wireless / The Applicant is proposing to construct and operate a 135-foot galvanized steel monopole communication tower, together with a 4-foot lightning rod and related antennas and equipment within a fenced compound located on a 7,000 square foot leased portion of the subject property.” Accela record 2026-PCCC-00185, Conditional Use Permit, use: Communication Tower, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 15, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 14, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Filed after the October 2026 report (not yet in a City report)
Record #
Application type
Project
Location
Filed
Status
2026-PCCC-00204
Modification of Conditions
Ann Sagle
1212 CANDLEWOOD DR, 23464 582
October 28, 2026
Submitted
What the City’s Accela records say
Ann Sagle (1212 CANDLEWOOD DR, 23464 582): “Ann Sagle / Modifications to a Conditional Use Permit (Accela Record #2025-PCCC-00200 issued on April 22, 2026” Accela record 2026-PCCC-00204, Modification of Conditions, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Documents on the Accela record (4): CUP_Final.pdf (Disclosure Statement*, uploaded October 28, 2026); MOCA_Final.pdf (Application*, uploaded October 28, 2026); Supporting documentation.pdf (Site Plan, uploaded October 28, 2026); Randy Text Message.docx (Other, uploaded October 28, 2026): “Transcript of text conversation with the adjacent propery owner in support of the modification request”.
District 2
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 10, 2026
Presubmittal Meeting
Princess Anne Landing
2500 Tournament Drive, District 2
H12-023705-PM
John Zaszewski, Timmons Group
PJ Scully
September 22, 2026
Comment Review
Mosquito Control
Pleasant Ridge Road, District 2
K16-023423-SP
Robyn Niss, Kimley-Horn and Associates, Inc.
Melissa Kellam
What the City’s Accela records say
Princess Anne Landing (DSC file H12-023705-PM): “Princess Anne Landing / Please see rezoning application filings for information related to (a) 2026-PCCC-00167, a request to rezone to A-18 & A-18(HCD) to construct a residential community, and (b) 2026-PCCC-00163, a request to rezone to B-2 to construct a childcare facility. / In addition, the project includes a reconfiguration and renovation of VB National Golf Course, construction of a golf maintenance facility, stay and play rental cottages, and expansion of existing SWMF facilities on site.” Accela record 2026-DSC-023705, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 23, 2026. Comments from 10 departments: Fire Marshal (September 11, 2026); Parks Planning Design Dev (September 16, 2026); Comprehensive Planning (September 10, 2026); Historic Preservation (September 23, 2026); Planning Admin Current (September 15, 2026); DSC Engineering (September 17, 2026); DSC Landscape Architect (September 10, 2026); DSC PU Engineer (September 10, 2026); PU Engineering (September 11, 2026); PW Traffic Engineering (September 17, 2026). No comments from 3 departments: Economic Development (September 9, 2026); Zoning (September 11, 2026); PW Real Estate (September 16, 2026). Other steps: Application Submittal: Received (September 4, 2026); Application Research: Complete (September 4, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 8, 2026); DSC Planner: Note (September 11, 2026).
Mosquito Control (DSC file K16-023423-SP): “Mosquito Control / The purpose of this site plan is to provide a new Mosquito Control Bureau facility that combines the office space and laboratory space with the garage space needed to conduct their testing and research in one location. This plan includes the moving of the existing salt storage, the demolition and relocation of some existing buildings and trailers, and associated well and septic improvements for the new facility.” Accela record 2026-DSC-023423, Site Plan, Office, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, August 30, 2026. Comments from 7 departments: Fire Marshal (August 13, 2026); DSC Engineering (August 26, 2026); DSC Planner (August 5, 2026); DSC Addressing (August 4, 2026); Zoning (August 17, 2026); PU Engineering (July 28, 2026); PW Traffic Engineering (August 10, 2026). No comments from 6 departments: Hampton Roads Sanitation District (July 24, 2026); Parks Planning Design Dev (August 10, 2026); DSC Landscape Architect (August 3, 2026); DSC PU Engineer (July 24, 2026); PW Real Estate (August 7, 2026); Planning Admin Floodplain (August 4, 2026). Other steps: Application Submittal: Received (July 21, 2026); Application Research: Complete (July 21, 2026); PM Submittal Review: Complete (July 21, 2026); Package Distribution: EDR Distribution (July 21, 2026).
Associated with previous City Council land use approvals
September 22, 2026
Single Family
Lot 95, Sandbridge Beach, North Area
2228 Sandpiper Road
By-right development
September 11, 2026
Single Family Demo
W Mayo Knotts Island
6468 Knotts Island Road
By-right development
September 28, 2026
Single Family Demo
Lot 19, Sandbridge Beach
3524 Sandfiddler Road
By-right development
What the City’s Accela records say
Southern Pines - Phase II (Princess Anne Road): “Southern Pines - Phase II / This project proposes the development of a vacant lot off of Princess Anne Road in Virginia Beach. Southern Pines Phase 2 will include a two-story clubhouse, a three-story apartment building, and four four-story apartment buildings, totaling to 175 apartment units on-site. The project also proposes a dog park and pool; and 282 on-site parking spaces. The project will extend George Wythe Drive to serve the proposed development. The site will be served by a new domestic water and fire connection in Princess Anne Road and new sanitary sewer connection in George Wythe Drive. The existing stormwater pond to the south of the development will be expanded to serve the proposed site and George Wythe expansion.” Accela record 2024-DSC-020131, Site Plan, Multi Family, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 9, 2026. Comments from 4 departments: Hampton Roads Sanitation District (January 16, 2026); DSC Engineering (August 12, 2026); DSC Planner (March 25, 2026); PW Stormwater Eng Center (March 30, 2026). No comments from 11 departments: Economic Development (October 10, 2024); Fire Marshal (January 15, 2026); Parks Planning Design Dev (January 9, 2026); Comprehensive Planning (October 23, 2024); Planning Admin Current (January 16, 2026); DSC Landscape Architect (March 19, 2026); DSC PU Engineer (January 15, 2026); DSC Addressing (March 12, 2026); Zoning (October 29, 2024); PU Engineering (March 13, 2026); PW Traffic Engineering (March 26, 2026). Other steps: Application Submittal: Resubmittal Received (August 3, 2026); Application Research: Complete (October 2, 2024); PM Submittal Review: Complete (August 3, 2026); Package Distribution: EDR Distribution (August 3, 2026); Final Utility Fee Sheet: Complete (September 9, 2026); Approval Letter: Additional Info Requested (September 9, 2026); Approval Stamping: Complete (October 7, 2026); Addressing: Complete (October 7, 2026).
Lot 95, Sandbridge Beach, North Area (2228 Sandpiper Road): “Lot 95, Sandbridge Beach, North Area / Single Family Site Plan for Lot 95, Sandbridge Beach, North Area - Section No. 3 (M.B. 45, Pg. 13) / (2228 Sandpiper Road)” Accela record 2026-DSC-023205, Site Plan, Single Family, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 22, 2026. No comments from 8 departments: DSC Engineering (September 22, 2026); DSC Planner (June 18, 2026); DSC PU Engineer (June 26, 2026); DSC Addressing (June 5, 2026); Zoning (June 15, 2026); PU Engineering (June 5, 2026); PW Traffic Engineering (August 10, 2026); Planning Admin Floodplain (June 11, 2026). Other steps: Application Submittal: Resubmittal Received (September 9, 2026); Application Research: Complete (June 3, 2026); PM Submittal Review: Complete (September 9, 2026); Package Distribution: EDR Distribution (September 9, 2026); Final Utility Fee Sheet: Complete (September 22, 2026); Approval Letter: Letter Sent (September 22, 2026); Approval Stamping: Complete (September 22, 2026); Addressing: Complete (September 24, 2026); Final Action: Plan Released (October 13, 2026).
W Mayo Knotts Island (6468 Knotts Island Road): “W Mayo Knotts Island / Single-family demo-only site plan” Accela record 2026-DSC-023653, Site Plan, Single Family Demo, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 11, 2026. Comments from 1 department: DSC Engineering (September 2, 2026). Other steps: Application Submittal: Received (August 26, 2026); Application Research: Complete (August 26, 2026); PM Submittal Review: Complete (August 26, 2026); Package Distribution: EDR Distribution (August 26, 2026); Final Utility Fee Sheet: Not Required (September 11, 2026); Approval Letter: Letter Sent (September 11, 2026); Approval Stamping: Complete (September 11, 2026); Addressing: Complete (September 14, 2026); Final Action: Plan Released (September 14, 2026).
Lot 19, Sandbridge Beach (3524 Sandfiddler Road): “Lot 19, Sandbridge Beach / Single Family Demolition Site Plan for Lot 19, Sandbridge Beach, Tract D - Section 2 (M.B. 67, Pg. 50) / (3524 Sandfiddler Road - GPIN 24326684450000)” Accela record 2026-DSC-023742, Site Plan, Single Family Demo, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 28, 2026. No comments from 1 department: DSC Engineering (September 23, 2026). Other steps: Application Submittal: Received (September 11, 2026); Application Research: Complete (September 11, 2026); PM Submittal Review: Complete (September 11, 2026); Package Distribution: EDR Distribution (September 11, 2026); Final Utility Fee Sheet: Not Required (September 28, 2026); Approval Letter: Letter Sent (September 28, 2026); Approval Stamping: Complete (September 28, 2026); Addressing: Complete (September 29, 2026).
Parcel directly South of 6108 Pocahontas Club Road
2026-PCCC-00183
Alexis Bailey
Request a variance to section 4.4(b) of the Subdivision Regulations to legally create the lot which is deficient in lot width.
Conditional Rezoning
Michael D. Sifen, Inc.
2293 Princess Anne Road & vacant parcel directly east of 2293 Princess Anne Road
2026-PCCC-00191
Alexis Bailey
Request to rezone from AG-1 & AG-2 Agricultural District to Conditional R-10 Residential District to develop 19 single family lots.
What the City’s Accela records say
Lindsay Braade (Parcel directly South of 6108 Pocahontas Club Road): “Lindsay Braade / The Applicant purchased the existing 2.4-acre parcel in July 2022 as a separately conveyed parcel. After the purchase, it was discovered that the parcel had previously been subdivided by deed without the benefit of a subdivision plat. This issue was not identified during the Applicant’s purchase of the property. / The Applicant did not create the subdivision or the existing lot configuration and is now attempting to correct the prior issue by having the property properly surveyed, platted, approved, and recorded in accordance with the City’s requirements. / During review of the proposed plat, the City determined that the existing parcel does not meet the current 150-foot minimum lot-width requirement for the Agricultural zoning district and advised that a variance from Section 4.4(b) of the Subdivision Regulations is required before the plat can be approved. / The hardship results from the existing dimensions and historical conveyance of the parcel, conditions that predate the Applicant’s ownership and cannot be corrected by the Applicant without altering the boundaries of property she does not own. / The Applicant is not seeking to further subdivide the property or create an additional lot. The Applicant purchased this parcel in July 2022 in its existing configuration, and the property has not been subdivided, altered, developed, or otherwise changed by the Applicant since purchase. It remains raw, undeveloped land in the same configuration in which it was acquired. The sole purpose of this request is to correct the pre-existing subdivision issue and allow the existing parcel to be properly approved and legally recorded by plat. Approval of the requested variance would allow the Applicant to complete that corrective process.” Accela record 2026-PCCC-00183, Subdivision Variance, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: No Response (October 14, 2026); Comprehensive Planning: Complete (October 19, 2026); Agriculture: Complete (October 23, 2026); Fire Marshal: Complete (October 21, 2026); Virginia Department of Health: Complete (October 28, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Michael D. Sifen, Inc. (2293 Princess Anne Road & vacant parcel directly east of 2293 Princess Anne Road): “Michael D. Sifen, Inc. / Assemblage of 2 parcels containing over 19 acres to construct 19 homes on lots containing a minimum of 12,000 sf” Accela record 2026-PCCC-00191, Conditional Change of Zoning, zoning AG2, proposed R-10 Residential, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 19, 2026); Comprehensive Planning: Complete (October 21, 2026); Agriculture: Complete (October 23, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 8, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: Complete (October 21, 2026); DSC Subdivision Review: Note (October 23, 2026).
Filed after the October 2026 report (not yet in a City report)
None so far.
District 3
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 3, 2026
Presubmittal Meeting
Rosemont Health & Rehabilitation Subdivision
3751 & 3750 Sentara Way, District 3
G07-023646-PM
Bryant Mountjoy, Stantec Inc.
PJ Scully
September 10, 2026
Presubmittal Meeting
Shoreline Apartments Resubdivision
4312 Holland Road, District 3
F08-023671-PM
John Katsias, The Katsias Company
Ronald Frink
September 17, 2026
Presubmittal Meeting
Texas Roadhouse Parking Addition
4313 Silverleaf Drive, District 3
F08-023733-PM
Danielle Benedict, Atwell LLC
Ronald Frink
September 22, 2026
Comment Review
Windsor Woods Stormwater Pump Station
South Boulevard, District 3
F07-022797-ESSW
Aladeen Alghazeer, Flatiron Dragados and Arcadis, Inc.
Ronald Frink
September 30, 2026
Comment Review
Gerber Collision & Glass
Dean Drive, District 3
I07-023177-SP
Matthew Whisler, P.E., RTM Engineering Consultants, LLC
Melissa Kellam
What the City’s Accela records say
Rosemont Health & Rehabilitation Subdivision (DSC file G07-023646-PM): “Rosemont Health & Rehab Subdivision / The applicant is exploring the potential to subdivide the existing property at 3751/3750 Sentara Way, Virginia Beach, VA 23452, as shown in the attached figure. Buildings, roads, parking layouts, land use will remain the same.” Accela record 2026-DSC-023646, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 14, 2026. Comments from 6 departments: Fire Marshal (September 3, 2026); DSC Engineering (September 10, 2026); DSC Planner (September 8, 2026); DSC PU Engineer (September 8, 2026); Zoning (September 10, 2026); PW Traffic Engineering (September 9, 2026). No comments from 5 departments: Parks Planning Design Dev (September 10, 2026); Comprehensive Planning (September 1, 2026); Planning Admin Current (August 31, 2026); DSC Landscape Architect (September 3, 2026); PU Engineering (September 8, 2026). Other steps: Application Submittal: Received (August 25, 2026); Application Research: Complete (August 25, 2026); PM Submittal Review: Complete (August 25, 2026); Package Distribution: EDR Distribution (August 26, 2026).
Shoreline Apartments Resubdivision (DSC file F08-023671-PM): “Shoreline Apartments Resubdivision / GPIN #1476-87-8534-0000 currently contains a retail shopping center anchored by Food Lion in addition to four apartment buildings that are associated with Shoreline Apartments (508-517 Shoreside Way). / The property owners would like to create a re-subdivision plat that would remove the four apartment buildings from GPIN #1476-87-8534-0000 and add them to GPIN #1476-88-9103-0000, which is 4133 Shoreline Circle, whose owner is Shoreline Apartments, LLC.” Accela record 2026-DSC-023671, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 16, 2026. Comments from 5 departments: Comprehensive Planning (September 10, 2026); Planning Admin Current (September 14, 2026); DSC Engineering (September 11, 2026); DSC Planner (September 11, 2026); DSC Project Coordinator (September 9, 2026). No comments from 8 departments: Fire Marshal (September 10, 2026); Parks Planning Design Dev (September 14, 2026); DSC Landscape Architect (September 10, 2026); DSC PU Engineer (September 10, 2026); DSC Addressing (September 10, 2026); Zoning (September 11, 2026); PU Engineering (September 11, 2026); PW Traffic Engineering (September 14, 2026). Other steps: Application Submittal: Received (August 31, 2026); Application Research: Complete (August 31, 2026); PM Submittal Review: Complete (August 31, 2026); Package Distribution: EDR Distribution (August 31, 2026).
Texas Roadhouse Parking Addition (DSC file F08-023733-PM): “Texas Roadhouse Parking Addition / Proposed parking lot addition project for the existing Texas Roadhsoue restaurant located at 4309 Silverleaf Drive. The proposed parking addition would add 107-spaces. With the existing 124-spaces on the Texas Roadhsoue lot, total parking would be 231-spaces.” Accela record 2026-DSC-023733, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 25, 2026. Comments from 7 departments: Parks Planning Design Dev (September 21, 2026); DSC Engineering (September 21, 2026); DSC Landscape Architect (September 17, 2026); DSC Project Coordinator (September 10, 2026); DSC PU Engineer (September 22, 2026); Zoning (September 21, 2026); PW Traffic Engineering (September 22, 2026). No comments from 3 departments: Fire Marshal (September 17, 2026); DSC Planner (September 23, 2026); PU Engineering (September 21, 2026). Other steps: Application Submittal: Received (September 9, 2026); Application Research: Complete (September 9, 2026); PM Submittal Review: Complete (September 9, 2026); Package Distribution: EDR Distribution (September 9, 2026).
Windsor Woods Stormwater Pump Station (DSC file F07-022797-ESSW): “Windsor Woods Stormwater Pump Station - Preliminary Clearing and Grading Activity / The preliminary clearing and grading plan for the Windsor Woods Pump Station project includes initial site clearing and demolition of existing site features to prepare the area for construction. This plan covers contractor laydown and setup activities, initial land grading, and the installation of several segments of permanent and temporary sheet pile/combi walls/ cofferdams to support site grading and equipment access for pump station construction. Additionally, it addresses the implementation of temporary and permanent drainage infrastructure along with erosion and sediment control measures to meet VESMP compliance throughout the construction process.” Accela record 2026-DSC-022797, Site Plan, E & S and Stormwater, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 8, 2026. Comments from 3 departments: DSC Engineering (September 8, 2026); DSC Planner (August 27, 2026); PW Traffic Engineering (August 25, 2026). No comments from 8 departments: Parks Planning Design Dev (April 3, 2026); DSC Landscape Architect (March 24, 2026); DSC Project Coordinator (August 16, 2026); DSC PU Engineer (April 1, 2026); Planning Admin Waterfront (June 30, 2026); Zoning (April 3, 2026); Planning Admin CBPA (August 13, 2026); Planning Admin Floodplain (April 2, 2026). Other steps: Application Submittal: Resubmittal Received (August 12, 2026); Application Research: Complete (March 13, 2026); PM Submittal Review: Complete (August 12, 2026); Package Distribution: EDR Distribution (August 12, 2026).
Gerber Collision & Glass (DSC file I07-023177-SP): “Gerber Collision and Glass / Redevelopment of existing building on site with site work.” Accela record 2026-DSC-023177, Site Plan, Commercial, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, September 15, 2026. Comments from 4 departments: DSC Engineering (September 14, 2026); DSC PU Engineer (October 23, 2026); Zoning (September 9, 2026); PW Traffic Engineering (September 4, 2026). No comments from 12 departments: Economic Development (June 29, 2026); Fire Marshal (September 3, 2026); Hampton Roads Sanitation District (June 15, 2026); Parks Planning Design Dev (June 25, 2026); Comprehensive Planning (August 26, 2026); DSC Landscape Architect (October 23, 2026); DSC Planner (September 3, 2026); DSC Addressing (August 21, 2026); PU Engineering (August 24, 2026); PW Real Estate (July 7, 2026); Planning Admin CBPA (June 11, 2026); Planning Admin Floodplain (June 16, 2026). Other steps: Application Submittal: Resubmittal Received (October 15, 2026); Application Research: Complete (June 1, 2026); PM Submittal Review: Complete (October 15, 2026); Package Distribution: EDR Distribution (October 16, 2026).
Associated with previous City Council land use approvals
September 1, 2026
Single Family Demo
Lots 91A & 92A, Gatewood Park Extd.
313 Gatewood Avenue
By-right development
What the City’s Accela records say
Beach Ford Car Lot (120 S. Lynnhaven Road): “Beach Ford Car Lot / The proposed project will remove the existing parking lot, remove the remnants of a demolished building, and pave a new car storage lot.” Accela record 2026-DSC-022488, Site Plan, Commercial, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 28, 2026. Comments from 2 departments: DSC Administrator (September 22, 2026); PW Traffic Engineering (September 22, 2026). No comments from 13 departments: Economic Development (January 29, 2026); Fire Marshal (February 11, 2026); Hampton Roads Sanitation District (February 2, 2026); Parks Planning Design Dev (February 18, 2026); Planning Admin Current (July 20, 2026); DSC Engineering (September 21, 2026); DSC Landscape Architect (February 11, 2026); DSC Planner (July 23, 2026); DSC PU Engineer (April 15, 2026); DSC Addressing (July 10, 2026); PU Engineering (July 7, 2026); PW Real Estate (February 18, 2026); Planning Admin Floodplain (February 11, 2026). Other steps: Application Submittal: Resubmittal Received (September 15, 2026); Application Research: Complete (January 21, 2026); PM Submittal Review: Complete (September 15, 2026); Package Distribution: EDR Distribution (September 16, 2026); Final Utility Fee Sheet: Not Required (September 28, 2026); Approval Letter: Letter Sent (September 28, 2026); Approval Stamping: Complete (September 28, 2026); Addressing: Not Required (September 28, 2026).
Lots 91A & 92A, Gatewood Park Extd. (313 Gatewood Avenue): “Lots 91A & 92A, Gatewood Park Extd. / Single Family Demo Plan” Accela record 2026-DSC-023367, Site Plan, Single Family Demo, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 1, 2026. No comments from 1 department: DSC Engineering (August 31, 2026). Other steps: Application Submittal: Resubmittal Received (August 13, 2026); Application Research: Complete (July 7, 2026); PM Submittal Review: Complete (August 14, 2026); Package Distribution: EDR Distribution (August 14, 2026); Final Utility Fee Sheet: Not Required (September 1, 2026); Approval Letter: Letter Sent (September 1, 2026); Approval Stamping: Complete (September 1, 2026); Addressing: Complete (September 8, 2026); Final Action: Plan Released (September 9, 2026).
Filed after the October 2026 report (not yet in a City report)
Record #
Application type
Project
Location
Filed
Status
2026-PCCC-00202
Conditional Use Permit
Autumn Fossett
443 DAUPHIN LN, 23452 532
October 25, 2026
Submitted
What the City’s Accela records say
Autumn Fossett (443 DAUPHIN LN, 23452 532): “Autumn Fossett / Roots & Sprouts is a small, home-based homeschool support and educational enrichment program intended to provide a nurturing, structured learning environment for children, with an emphasis on foundational academic skills, social development, and individualized instruction. / The proposed program will operate from my primary residence in Virginia Beach, Virginia. Enrollment will be limited to a maximum of four children from outside the household at any one time. The program is proposed to operate two days per week for three hours per day, for a total of six scheduled instructional hours per week. Hours of operation will be Tuesday and Wednesday 9:00am-12:00pm. The following years I plan to go up to a Monday, Tuesday, Wednesday, and Thursday program from 9:00am-12:00pm. / The program will be operated by the resident (property owner’s wife), with no additional employees planned. Parents will retain responsibility for their children’s home education, and Roots & Sprouts will provide supplemental educational instruction and support. / Instruction will take place within the existing residential structure. No new buildings, additions, exterior alterations, or changes to the exterior appearance of the property are proposed. The existing residential building materials and appearance will remain unchanged. / The program will be designed to minimize impacts on the surrounding residential neighborhood. Student arrivals and departures will be coordinated to reduce congestion, and families will be instructed to park in the driveway where space is available. No routine student parking on the street is intended. The program will not include outdoor commercial activities, retail sales, or amplified noise. / No prior City Council approvals, variance requests, or Chesapeake Bay Preservation Act requests are known to be associated with this proposal. If any additional approvals are determined to be necessary, I will follow the applicable City requirements. / I respectfully request consideration of a Conditional Use Permit to operate this small-scale educational support program as a home occupation while maintaining the residential character of the property and minimizing impacts on neighboring residences.” Accela record 2026-PCCC-00202, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Burton Station Road, GPINs 14587806890000, 14587952720000, 14587930890000, 14587809900000, 14587910510000, 14587921240000, 14587922770000, 14587933380000, & 14587935800000, District 4
B04-023645-PM
Amanda Fedorchak, Timmons Group
PJ Scully
What the City’s Accela records say
Charles Barker Mercedes Building Addition (DSC file D07-023670-PM): “Charles Barker Mercedes Building Addition / The project is for an approximately 1,400 SF building addition to the exisitng facility to add an additional drive in lane to the service reception area. There will also be associated pavement redesign and utility relocaton which will extend the limits of disturbance beyond 2,500 SF so stormwater and E&S design will be included.” Accela record 2026-DSC-023670, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 15, 2026. Comments from 8 departments: Fire Marshal (September 3, 2026); Planning Admin Current (September 8, 2026); DSC Engineering (September 8, 2026); DSC Landscape Architect (September 3, 2026); DSC Planner (September 8, 2026); DSC Project Coordinator (September 3, 2026); DSC PU Engineer (September 8, 2026); PW Traffic Engineering (September 8, 2026). No comments from 4 departments: Parks Planning Design Dev (September 14, 2026); Comprehensive Planning (September 8, 2026); Zoning (September 3, 2026); PU Engineering (September 8, 2026). Other steps: Application Submittal: Received (August 31, 2026); Application Research: Complete (August 31, 2026); PM Submittal Review: Complete (September 2, 2026); Package Distribution: EDR Distribution (September 3, 2026).
Burton Station Multi-Family (DSC file B04-023645-PM): “Burton Station Multi-Family / This project proposes a 374-unit apartment complex with a clubhouse and pool in an existing vacant parcel off of Burton Station Road. The parcel is in the City of Virginia Beach but sits on the Virginia Beach/Norfolk boundary. The proposed design includes six 4-story apartment buildings with associated parking lot. The site proposes connection to both Burton Station Road and Premium Outlets Boulevard.” Accela record 2026-DSC-023645, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 16, 2026. Comments from 10 departments: Fire Marshal (September 4, 2026); Parks Planning Design Dev (September 10, 2026); Comprehensive Planning (September 8, 2026); Planning Admin Current (September 3, 2026); DSC Engineering (September 8, 2026); DSC Landscape Architect (September 3, 2026); DSC Planner (September 8, 2026); DSC Project Coordinator (August 31, 2026); DSC PU Engineer (September 8, 2026); PW Traffic Engineering (September 8, 2026). No comments from 3 departments: Economic Development (September 15, 2026); Zoning (September 3, 2026); PU Engineering (September 8, 2026). Other steps: Application Submittal: Received (August 25, 2026); Application Research: Complete (August 25, 2026); PM Submittal Review: Complete (August 25, 2026); Package Distribution: EDR Distribution (August 26, 2026).
Request to rezone from R-10 Residential District to Conditional B-2 Community Business District to operate an Assembly Use with an expansion to the parking lot.
Conditional Use Permit
Fraternal Order of Eagles, Aerie 3204, Inc.
1057 & 1061 Newtown Road
2026-PCCC-00187
Marchelle Coleman
Request to operate an assembly use.
Conditional Rezoning
Prosper Homes & Investments, LLC
5845 Burton Station Road
2026-PCCC-00193
Shynae Howard
Request to rezone from R-5D Residential District to Conditional A-18 Residential District to develop a 30-unit townhome style condominium community.
What the City’s Accela records say
Fraternal Order of Eagles, Aerie 3204, Inc. (1057 & 1061 Newtown Road): “Fraternal Order of the Eagles, Aerie 3204, Inc. / The proposed project consists of a +/-1,900-square-foot expansion of the Fraternal Order of Eagles (FOE) building. Due to parking requirements, FOE has acquired parcel GPIN 14688381030000 and is requesting to rezone the parcel from R-10 Residential District to B-2 Community Business District to provide additional parking for the existing assembly use.” Accela record 2026-PCCC-00188, Conditional Change of Zoning, zoning R10, proposed B-2 Community Business, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 16, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 14, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: Complete (October 23, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Fraternal Order of Eagles, Aerie 3204, Inc. (1057 & 1061 Newtown Road): “Fraternal Order of Eagles, Aerie 3204, Inc. / The proposed project consists of a +/-1,900-square-foot expansion of the Fraternal Order of Eagles (FOE) building. Due to parking requirements, FOE has acquired parcel GPIN 14688381030000 and is requesting to rezone the parcel from R-10 Residential District to B-2 Community Business District to provide additional parking for the existing assembly use. / Anticipated Variance: The site does not currently meet the assembly use parking requirement of one parking space per 100 square feet. The proposed building expansion will add +/- 1,900 square feet, resulting in a total parking requirement of 95 spaces. The proposed site layout provides 93 parking spaces; therefore, a variance under the Zoning Ordinance Section 103(m) will be requested for the 2 missing parking spaces to satisfy the requirements of Appendix A, Article 2.1-203, Assembly Uses.” Accela record 2026-PCCC-00187, Conditional Use Permit, use: Assembly Use (Clubs), status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 16, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 14, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: Complete (October 23, 2026); DSC Subdivision Review: Note (October 23, 2026).
Prosper Homes & Investments, LLC (5845 Burton Station Road): “Prosper Homes & Investments, LLC / The subject property has been owned by the same family (Brooks/Martin) for almost 83 years and with the passing of Willie D. Martin, Sr. in 2024 and at his direction as set forth in his Will, the property is under contract to be sold to the Applicant. The property is in the Burton Station S.G.A. on Burton Station Road adjacent to the northwest side of a very well maintained Senior Housing and Housing For the Disabled Community that is situated at the northwest corner of Burton Station Road and Tolliver Road. The proposal will facilitate creation of a 30 townhome residential condominium community on this 2.2 acre site. Six (6) buildings, each containing five (5) dwellings are proposed. Each unit will have a one or one & one-half car garage and two (2) unenclosed, uncovered parking spaces. / The site development plan, including landscaping along with renderings of the proposed homes have been proffered. The Plan includes a fenced dog park/run, a playground and picnic area as well as six (6) visitor parking spaces. The homes will have fenced yards with a 15 foot wide Category IV landscaped buffer between the community’s property line and the fenced yards. The actual residential density will be 13-1/2 units/acre and the lot coverage shall not exceed 50%.” Accela record 2026-PCCC-00193, Conditional Change of Zoning, zoning R5D, proposed A-18 Apartment, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: Complete (October 19, 2026); Comprehensive Planning: Complete (October 21, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 15, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Stormwater: Complete (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Filed after the October 2026 report (not yet in a City report)
None so far.
District 5
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 1, 2026
Comment Review
Affordable Towing
Horse Pasture Road, Rose Hall, District 5
I10-020422-SP
Robert W. Sawyer, P.E., L.S., Civil Engineering and Construction Services, LLC
Melissa Kellam
September 3, 2026
Presubmittal Meeting
Encounter Court Industrial Development -Dayspring Pens
2525 Encounter Court, District 5
I10-023648-PM
Michael Gaddy P.E., L.S., Gaddy Engineering Co.
Kristin Bauer
September 25, 2026
Inquiry
Apartment Development Inquiry
1537 Dam Neck Road, District 5
n/a
Alexandra Serranore
Kristin Bauer
What the City’s Accela records say
Affordable Towing (DSC file I10-020422-SP): “Affordable Towing Storage Yard / This project is for the construction of a storage yard for towed vehicles.” Accela record 2024-DSC-020422, Site Plan, Commercial, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, May 27, 2026. Comments from 3 departments: Hampton Roads Sanitation District (May 11, 2026); DSC Engineering (May 26, 2026); PW Traffic Engineering (May 26, 2026). No comments from 9 departments: Economic Development (December 17, 2024); Fire Marshal (July 31, 2025); Parks Planning Design Dev (December 31, 2024); Planning Admin Current (May 21, 2026); DSC Landscape Architect (July 28, 2025); DSC PU Engineer (May 6, 2026); DSC Addressing (December 16, 2024); PU Engineering (August 6, 2025); PW Real Estate (May 18, 2026). Other steps: Application Submittal: Resubmittal Received (April 29, 2026); Application Research: Complete (December 5, 2024); PM Submittal Review: Complete (April 29, 2026); Package Distribution: EDR Distribution (April 30, 2026).
Encounter Court Industrial Development -Dayspring Pens (DSC file I10-023648-PM): “Encounter Court Industrial Development - Dayspring Pens / The owners of the existing property located at 2509 Encounter Court (business - Dayspring Pens) has purchased the undeveloped parcel next door, 2525 Encounter Court. The development plan is to vacate the interior parcel line and create one overall parcel for the development. A new 20k SF industrial building, along with parking, will be constructed on the new parcel. The first floor of the building will be warehouse space with the second floor (mezzanine style) to be office space to support the warehouse.” Accela record 2026-DSC-023648, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 14, 2026. Comments from 8 departments: Fire Marshal (September 3, 2026); Parks Planning Design Dev (September 10, 2026); Comprehensive Planning (September 8, 2026); Planning Admin Current (September 3, 2026); DSC Engineering (September 8, 2026); DSC Landscape Architect (September 3, 2026); DSC Planner (September 8, 2026); PW Traffic Engineering (September 11, 2026). No comments from 4 departments: Economic Development (September 9, 2026); DSC PU Engineer (September 3, 2026); Zoning (September 3, 2026); PU Engineering (August 28, 2026). Other steps: Application Submittal: Received (August 25, 2026); Application Research: Complete (August 25, 2026); PM Submittal Review: Complete (August 25, 2026); Package Distribution: EDR Distribution (August 25, 2026).
Atlantic Treatment Plant ROCI Master Stormwater Plan and Work Package No. 2
645 Firefall Drive
By-right development
September 23, 2026
Commercial
St. John The Apostle Church -Parish Hall
1968 Sandbridge Road
Associated with previous City Council land use approvals
What the City’s Accela records say
Atlantic Treatment Plant ROCI Master Stormwater Plan and Work Package No. 2 (645 Firefall Drive): “Atlantic Treatment Plant ROCI Master Stormwater Plan and Work Package No. 2 / The project will provide solids reliability and odor improvements at HRSD’s Atlantic Treatment Plant.” Accela record 2025-DSC-022343, Site Plan, Commercial, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 18, 2026. Comments from 2 departments: DSC Engineering (September 1, 2026); PW Traffic Engineering (September 1, 2026). No comments from 10 departments: Economic Development (January 29, 2026); Fire Marshal (January 28, 2026); DSC Landscape Architect (January 15, 2026); DSC Planner (July 9, 2026); DSC PU Engineer (May 5, 2026); DSC Addressing (April 29, 2026); Zoning (May 5, 2026); PU Engineering (January 13, 2026); Planning Admin CBPA (January 9, 2026); Planning Admin Floodplain (January 20, 2026). Other steps: Application Submittal: Resubmittal Received (August 14, 2026); Application Research: Complete (January 8, 2026); PM Submittal Review: Complete (August 17, 2026); Package Distribution: EDR Distribution (August 18, 2026); Final Utility Fee Sheet: Complete (September 18, 2026); Approval Letter: Letter Sent (September 18, 2026); Approval Stamping: Complete (September 18, 2026); Addressing: Complete (September 21, 2026).
St. John The Apostle Church -Parish Hall (1968 Sandbridge Road): “St Johns Church - Parish Hall / Proposed Parish Hall Building” Accela record 2025-DSC-021036, Site Plan, Commercial, status Approved.
City review (Accela, as of October 30, 2026): record status now Approved; review result Approved, September 23, 2026. Comments from 2 departments: Hampton Roads Sanitation District (April 3, 2025); DSC Engineering (August 31, 2026). No comments from 10 departments: Economic Development (April 13, 2025); Fire Marshal (August 21, 2026); Parks Planning Design Dev (June 25, 2026); Planning Admin Current (March 25, 2026); DSC Landscape Architect (March 18, 2026); DSC PU Engineer (August 24, 2026); DSC Addressing (June 10, 2026); Zoning (March 23, 2026); PU Engineering (August 18, 2026); PW Traffic Engineering (August 14, 2026). Other steps: Application Submittal: Resubmittal Received (August 7, 2026); Application Research: Complete (April 1, 2025); PM Submittal Review: Complete (August 7, 2026); Package Distribution: EDR Distribution (August 10, 2026); Final Utility Fee Sheet: Complete (September 23, 2026); Approval Letter: Letter Sent (September 23, 2026); Approval Stamping: Complete (September 23, 2026); Addressing: Complete (September 24, 2026).
Request to modify proffers to a previously approved Conditional Rezoning.
Conditional Use Permit
Seasons Clinic, LLC
303 Atlantic Avenue, Unit 1003
2026-PCCC-00196
Alexis Bailey
Request to operate a one-bedroom short term rental.
What the City’s Accela records say
CIG Castleton LLC (2424 Castleton Commerce Way): “CIG Castleton LLC / Applicant proposes to modify the the current proffers to permit any building located on the Property (including, without limitation, Buildings E1-E10 as shown on the Concept Plan) may be used for any use that is (a) otherwise permitted on the Property under the City Zoning Ordinance, (b) designated as compatible with the 70-75 dB DNL Noise Zone under Section 1804 of the Zoning Ordinance either (i) as of the date of this Agreement, or (ii) by subsequent amendment to Section 1804, and (c) not restricted by Proffers #2 or #6 of the Original Proffers.” Accela record 2026-PCCC-00198, Modification of Proffers, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: No Response (October 19, 2026); Comprehensive Planning: No Response (October 21, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 8, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Documents on the Accela record (5): Surveys.pdf (Survey, uploaded October 2, 2026); Application.pdf (Application*, uploaded October 2, 2026); Proffers.pdf (Proffers, uploaded October 2, 2026); Disclosure Statement.pdf (Disclosure Statement*, uploaded October 2, 2026); Check 81729.pdf (Other, uploaded October 9, 2026).
Seasons Clinic, LLC (303 Atlantic Avenue, Unit 1003): “Seasons Clinic, LLC / Short-term rental use within an existing 1-bedroom condominium footprint at Dolphin Run: The residential layout features a primary bedroom outfitted with two queen beds, two full independent bathrooms, a full kitchen, and a common-area living/dining room combination layout. The property will be managed by a professional local short-term property firm, maintaining a strict maximum overnight capacity of 4 guests in its current state.” Accela record 2026-PCCC-00196, Conditional Use Permit, use: Short Term Rental, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); Fire Marshal: Complete (October 20, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Filed after the October 2026 report (not yet in a City report)
Record #
Application type
Project
Location
Filed
Status
2026-PCCC-00199
Conditional Use Permit
Mission Enterprises, LLC
501 VIRGINIA BEACH BLVD, 23451
October 7, 2026
Submitted
What the City’s Accela records say
Mission Enterprises, LLC (501 VIRGINIA BEACH BLVD, 23451): “Mission Enterprises, LLC / Assembly Use in conjunction with the Esoteric Restaurant” Accela record 2026-PCCC-00199, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Jeremy Yee, P.E., Kimley-Horn and Associates, Inc.
Melissa Kellam
September 3, 2026
Presubmittal Meeting
Subdivision Inquiry, 2 Single Family Lots
308 55th Street, District 6
L04-023661-PM
Eric Garner, L.S., WPL
Kristin Bauer
September 10, 2026
Presubmittal Meeting
Ramada Plaza by Wyndham
2809 Atlantic Avenue, District 6
M06-023691-PM
Ryan Shrader, MSA, P.C.
Theresa Holleran
September 10, 2026
Presubmittal Meeting
Potters Road Development Inquiry
Potters Road, GPIN 24076480890000, District 6
J07-023704-PM
Eric Garner, L.S., WPL
PJ Scully
September 10, 2026
Presubmittal Meeting
Residential Development
620 23rd Street, District 6
L06-023701-PM
Cory Fout, Volkert, Inc.
PJ Scully
September 11, 2026
Inquiry
Commercial Development Inquiry
919 Owls Creek Lane, District 6
n/a
Joseph Conway
PJ Scully
September 14, 2026
Comment Review
19th Street Garage
825 18th Street, District 6
L06-023427-SP
Robyn Niss, Kimley-Horn and Associates, Inc.
Theresa Holleran
September 15, 2026
Inquiry
Commercial Development Inquiry
Potters Road, GPIN 24076480890000, District 6
n/a
Sebastian Martin
Kristin Bauer
September 17, 2026
Comment Review
19th Street Garage
825 18th Street, District 6
L06-023427-SP
Robyn Niss, Kimley-Horn and Associates, Inc.
Theresa Holleran
September 17, 2026
Presubmittal Meeting
Rezoning Inquiry -Industrial District
1117 Jackson Street, District 6
L07-023737-PM
Sagie Doron, DS Development and Construction
PJ Scully
September 22, 2026
Inquiry
Apartment Complex Inquiry
2016 Arctic Avenue, District 6
n/a
David Moghadam, Arctic Plaza, LLC
Kristin Bauer
September 30, 2026
Comment Review
31st Street Shops
3100 Atlantic Avenue, District 6
M05-023568-SP
Lane Fledderus, John Sandow Engineering, LLC
Theresa Holleran
What the City’s Accela records say
Hall Toyota Parking Lot Expansion (DSC file J06-022334-SP): “Hall Toyota Parking Lot Expansion / Development of parking lot expansion for dealership inventory storage” Accela record 2025-DSC-022334, Site Plan, Commercial, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, August 25, 2026. Comments from 1 department: DSC Engineering (August 24, 2026). No comments from 13 departments: Economic Development (January 2, 2026); Fire Marshal (January 13, 2026); Hampton Roads Sanitation District (December 29, 2025); Parks Planning Design Dev (January 9, 2026); Planning Admin Current (August 11, 2026); DSC Landscape Architect (April 28, 2026); DSC Planner (May 6, 2026); DSC PU Engineer (April 28, 2026); DSC Addressing (January 2, 2026); PU Engineering (December 29, 2025); PW Real Estate (January 12, 2026); PW Traffic Engineering (October 27, 2026); Planning Admin Floodplain (January 13, 2026). Other steps: Application Submittal: Resubmittal Received (October 13, 2026); Application Research: Complete (December 17, 2025); PM Submittal Review: Complete (October 14, 2026); Package Distribution: EDR Distribution (October 15, 2026).
Subdivision Inquiry, 2 Single Family Lots (DSC file L04-023661-PM): “308 55th Street / Proposed 2 lot Subdivision for Single Family Only lots” Accela record 2026-DSC-023661, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 14, 2026. Comments from 6 departments: Planning Admin Current (September 9, 2026); DSC Engineering (September 3, 2026); DSC Landscape Architect (September 3, 2026); DSC PU Engineer (September 8, 2026); Zoning (September 3, 2026); Planning Admin Floodplain (September 9, 2026). No comments from 5 departments: Fire Marshal (September 3, 2026); Parks Planning Design Dev (September 10, 2026); Comprehensive Planning (September 1, 2026); PU Engineering (August 28, 2026); PW Traffic Operations (September 9, 2026). Other steps: Application Submittal: Received (August 26, 2026); Application Research: Complete (August 26, 2026); PM Submittal Review: Complete (August 26, 2026); Package Distribution: EDR Distribution (August 26, 2026); DSC Planner: Note (September 9, 2026).
Ramada Plaza by Wyndham (DSC file M06-023691-PM): “Ramada Plaza by Wyndham / See attached documents named “26115 Civil Project Markup”, “26115 Topo)Signed 7-20-2026”, “Parking Design Intent”. Project includes several areas of remediation associated with ADA accessiblilty site enhancments, equipment pad modification, as well as parking lot reconfiguration.” Accela record 2026-DSC-023691, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 22, 2026. Comments from 5 departments: DSC Engineering (September 15, 2026); DSC Landscape Architect (September 14, 2026); DSC Planner (September 15, 2026); Zoning (September 16, 2026); PW Traffic Engineering (September 15, 2026). Other steps: Application Submittal: Received (September 3, 2026); Application Research: Complete (September 3, 2026); PM Submittal Review: Complete (September 11, 2026); Package Distribution: EDR Distribution (September 11, 2026).
Potters Road Development Inquiry (DSC file J07-023704-PM): “Potters Road Development / Mr. Newell is looking to purchase the vacant property off Potters Road (Just to the west of 1760 Potters Road). He is seeking to place a 30’x60′ metal building for use for an office and covered storage areas. The site will utilize the two existing entrances and will provide parking on-site for his tree service vechiles.” Accela record 2026-DSC-023704, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 22, 2026. Comments from 8 departments: Fire Marshal (September 10, 2026); Comprehensive Planning (September 10, 2026); Planning Admin Current (September 10, 2026); DSC Engineering (September 15, 2026); DSC Landscape Architect (September 10, 2026); DSC PU Engineer (September 10, 2026); PU Engineering (September 11, 2026); PW Traffic Engineering (September 17, 2026). No comments from 3 departments: Parks Planning Design Dev (September 16, 2026); DSC Planner (September 11, 2026); Zoning (September 11, 2026). Other steps: Application Submittal: Received (September 4, 2026); Application Research: Complete (September 4, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 8, 2026).
Residential Development (DSC file L06-023701-PM): “620 23rd St / Option 1: Want to build a new single family home 2100-2300 sqft 2-3 stories and a separate garage apartment 2-3 stories 800 sqft on 22.5 st. / Option 2: Rezone to A12 and build two single family homes 2-3 stories 1500-1700 sqft each. Similar to 2300 Mediterranean Aven corner lot but better.” Accela record 2026-DSC-023701, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 21, 2026. Comments from 6 departments: DSC Engineering (September 11, 2026); DSC Landscape Architect (September 10, 2026); DSC PU Engineer (September 14, 2026); Zoning (September 14, 2026); PU Engineering (September 11, 2026); PW Traffic Engineering (September 15, 2026). No comments from 5 departments: Fire Marshal (September 10, 2026); Parks Planning Design Dev (September 16, 2026); Comprehensive Planning (September 10, 2026); Planning Admin Current (September 8, 2026); DSC Planner (September 11, 2026). Other steps: Application Submittal: Received (September 4, 2026); Application Research: Complete (September 4, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 8, 2026).
19th Street Garage (DSC file L06-023427-SP): “19th Street Garage / This project consists of a proposed parking garage and restaurant and retail spaces, as well as the extension of the Parks Ave right-of-way at the south intersection of 19th St and Parks Ave.” Accela record 2026-DSC-023427, Site Plan, Mixed Use, status Not Accepted.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, August 26, 2026. Comments from 15 departments: Economic Development (August 5, 2026); Fire Marshal (August 11, 2026); Hampton Roads Sanitation District (July 24, 2026); Parks Landscape Management (August 10, 2026); Parks Planning Design Dev (August 10, 2026); DSC Engineering (August 26, 2026); DSC Landscape Architect (August 4, 2026); DSC Planner (August 5, 2026); DSC PU Engineer (August 10, 2026); DSC Addressing (August 6, 2026); Zoning (August 17, 2026); PU Engineering (July 24, 2026); PW Traffic Operations (August 12, 2026); PW Stormwater Eng Center (August 10, 2026); PW Traffic Engineering (August 14, 2026). Other steps: Application Submittal: Resubmittal Received (October 26, 2026); Application Research: Complete (July 17, 2026); PM Submittal Review: Complete (October 27, 2026); Package Distribution: EDR Distribution (October 28, 2026).
19th Street Garage (DSC file L06-023427-SP): “19th Street Garage / This project consists of a proposed parking garage and restaurant and retail spaces, as well as the extension of the Parks Ave right-of-way at the south intersection of 19th St and Parks Ave.” Accela record 2026-DSC-023427, Site Plan, Mixed Use, status Not Accepted.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, August 26, 2026. Comments from 15 departments: Economic Development (August 5, 2026); Fire Marshal (August 11, 2026); Hampton Roads Sanitation District (July 24, 2026); Parks Landscape Management (August 10, 2026); Parks Planning Design Dev (August 10, 2026); DSC Engineering (August 26, 2026); DSC Landscape Architect (August 4, 2026); DSC Planner (August 5, 2026); DSC PU Engineer (August 10, 2026); DSC Addressing (August 6, 2026); Zoning (August 17, 2026); PU Engineering (July 24, 2026); PW Traffic Operations (August 12, 2026); PW Stormwater Eng Center (August 10, 2026); PW Traffic Engineering (August 14, 2026). Other steps: Application Submittal: Resubmittal Received (October 26, 2026); Application Research: Complete (July 17, 2026); PM Submittal Review: Complete (October 27, 2026); Package Distribution: EDR Distribution (October 28, 2026).
Rezoning Inquiry -Industrial District (DSC file L07-023737-PM): “Birdneck Warehouse / This is a Split Zoned property that will require REZONING / We would like to carry the I9 Zoning throughout and build a 2-story warehouse with a base area of 7200 sqft.” Accela record 2026-DSC-023737, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 28, 2026. Comments from 9 departments: Parks Planning Design Dev (September 21, 2026); Comprehensive Planning (September 18, 2026); Planning Admin Current (September 17, 2026); DSC Engineering (September 17, 2026); DSC Landscape Architect (September 18, 2026); DSC PU Engineer (September 22, 2026); PU Engineering (September 17, 2026); PW Traffic Engineering (September 17, 2026); Planning Admin Floodplain (September 25, 2026). No comments from 4 departments: Fire Marshal (September 17, 2026); DSC Planner (September 23, 2026); Zoning (September 21, 2026); Planning Admin CBPA (September 15, 2026). Other steps: Application Submittal: Received (September 10, 2026); Application Research: Complete (September 10, 2026); PM Submittal Review: Complete (September 10, 2026); Package Distribution: EDR Distribution (September 10, 2026).
31st Street Shops (DSC file M05-023568-SP): “31st Street Shops / Include grading, stormwater management, utility services, and fire protection infrastructure. 14,514 Sqft proposed bldg.” Accela record 2026-DSC-023568, Site Plan, Commercial, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review; review result Resubmittal Required, September 18, 2026. Comments from 11 departments: Fire Marshal (September 2, 2026); Parks Landscape Management (September 3, 2026); Parks Planning Design Dev (October 28, 2026); DSC Engineering (September 16, 2026); DSC Landscape Architect (October 26, 2026); DSC Planner (October 29, 2026); DSC PU Engineer (September 8, 2026); DSC Addressing (October 28, 2026); Zoning (September 4, 2026); PU Engineering (October 20, 2026); PW Traffic Engineering (September 3, 2026). No comments from 3 departments: Economic Development (August 21, 2026); Hampton Roads Sanitation District (October 19, 2026); Planning Admin Current (September 3, 2026). Other steps: Application Submittal: Received (October 19, 2026); Application Research: Complete (October 19, 2026); PM Submittal Review: Complete (October 19, 2026); Package Distribution: EDR Distribution (October 19, 2026).
66th Street Duplex (215 A & 215 B 66th Street): No matching Accela record found.
Lot 32, Block 6, Section Three, West Alanton (1420 Franklin Drive): “Lot 32, Block 6, Section Three, West Alanton / Single Family Site Plan for Lot 32, Block 6, Section Three, West Alanton (M.B. 55, PG. 7) / (1420 Franklin Drive - GPIN 24095093410000)” Accela record 2026-DSC-022918, Site Plan, Single Family, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 1, 2026. Comments from 1 department: DSC Project Coordinator (May 7, 2026). No comments from 7 departments: DSC Engineering (September 1, 2026); DSC Planner (April 24, 2026); DSC PU Engineer (June 25, 2026); DSC Addressing (April 13, 2026); Zoning (April 21, 2026); PU Engineering (April 13, 2026); PW Traffic Engineering (June 26, 2026). Other steps: Application Submittal: Resubmittal Received (July 24, 2026); Application Research: Complete (April 9, 2026); PM Submittal Review: Complete (July 24, 2026); Package Distribution: EDR Distribution (July 27, 2026); Final Utility Fee Sheet: Complete (September 1, 2026); Approval Letter: Letter Sent (September 1, 2026); Approval Stamping: Complete (September 1, 2026); Addressing: Complete (September 1, 2026); Final Action: Plan Released (September 2, 2026).
Lot 26, Olive Heights Annex (109 Ackiss Avenue): No matching Accela record found.
Lot 1, Linkhorn Cove (1605 Bluecher Court): “Lot 1, Linkhorn Cove / Single Family Demolition Site Plan in RPA for Lot 1, Amended Subdivision of Linkhorn Cove, Section One (M.B. 122, Pg. 23) / (1605 Bluecher Court - Church Residence)” Accela record 2026-DSC-023570, Site Plan, Single Family Demo, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Slip Sheet Required, September 1, 2026. Comments from 1 department: DSC Engineering (August 31, 2026). Other steps: Application Submittal: Received (August 11, 2026); Application Research: Complete (August 11, 2026); PM Submittal Review: Complete (August 12, 2026); Package Distribution: EDR Distribution (August 12, 2026); Final Utility Fee Sheet: Complete (September 1, 2026); Approval Letter: Letter Sent (September 1, 2026); Approval Stamping: Complete (September 1, 2026); Addressing: Complete (September 10, 2026); Final Action: Plan Released (September 14, 2026).
Site E, Lake Shore Park (1314 E. Bay Shore Drive): “Site E, Lake Shore Park / Single Family Site Plan in RPA for Site E, Property of Dr. Robert Barr, Located in Lake Shore Park (M.B. 26, Pg. 44) / (1314 E Bay Shore Drive – GPIN 24185917670000)” Accela record 2026-DSC-023350, Site Plan, Single Family RPA, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 9, 2026. Comments from 1 department: PW Traffic Engineering (August 14, 2026). No comments from 7 departments: DSC Engineering (August 31, 2026); DSC Landscape Architect (July 6, 2026); DSC Planner (July 16, 2026); DSC PU Engineer (September 3, 2026); DSC Addressing (August 11, 2026); Zoning (July 13, 2026); PU Engineering (September 1, 2026). Other steps: Application Submittal: Resubmittal Received (August 10, 2026); Application Research: Complete (July 2, 2026); PM Submittal Review: Complete (August 10, 2026); Package Distribution: EDR Distribution (August 10, 2026); Final Utility Fee Sheet: Complete (September 9, 2026); Approval Letter: Letter Sent (September 9, 2026); Approval Stamping: Complete (September 9, 2026); Addressing: Complete (September 10, 2026); Final Action: Plan Released (September 25, 2026).
Lot 45, North Alanton (1612 Arnold Circle): “Lot 45, North Alanton / Single Family Site Plan in RPA for Lot 45, Composite Plat, Sections 1, 2, 3, & 4, North Alanton (M.B. 34, Pg. 43) / (1612 Arnold Circle - GPIN 24196774570000)” Accela record 2026-DSC-023263, Site Plan, Single Family RPA, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 17, 2026. No comments from 9 departments: DSC Engineering (September 15, 2026); DSC Landscape Architect (August 19, 2026); DSC Planner (June 29, 2026); DSC PU Engineer (August 25, 2026); DSC Addressing (September 14, 2026); Zoning (August 19, 2026); PU Engineering (August 18, 2026); PW Traffic Engineering (August 25, 2026); Planning Admin CBPA (June 17, 2026). Other steps: Application Submittal: Resubmittal Received (August 18, 2026); Application Research: Complete (June 12, 2026); PM Submittal Review: Complete (August 18, 2026); Package Distribution: EDR Distribution (August 18, 2026); Final Utility Fee Sheet: Complete (September 17, 2026); Approval Letter: Letter Sent (September 17, 2026); Approval Stamping: Complete (September 17, 2026); Addressing: Complete (September 17, 2026); Final Action: Plan Released (September 17, 2026).
The Bass Family Revocable Trust & Matthew Scott & Ashley Mezyk Brady
216 55th Street & 217 54th Street
2026-PCCC-00192
Arianna Low
Request to close a 15-foot portion of an unimproved alley.
Expansion to a Nonconforming Use or Structure
Princess Anne Country Club
3800 Pacific Avenue
2025-PCCC-00182
Alexis Bailey
Request for an expansion of a nonconforming use.
Modification of Conditions
Princess Anne Country Club
3800 Pacific Avenue
2025-PCCC-00181
Alexis Bailey
Request to modify a previously approved Conditional Use Permit.
Conditional Rezoning
Prosper Homes & Investments, LLC
1725 S Woodhouse Road
2026-PCCC-00189
Shynae Howard
Request to rezone from R-20 Residential District and R-40 Residential District to Conditional R- 20 Residential District to develop 4 single family lots.
Conditional Use Permit
Sophia Ellis
523 20th Street
2026-PCCC-00175
Alexis Bailey
Request to operate a four-bedroom short term rental.
Conditional Use Permit
Dmitriy Kirzhner
304 28th Street, Unit 301
2026-PCCC-00182
Alexis Bailey
Request to operate a two-bedroom short term rental.
Conditional Use Permit
Greg Zinis
304 26th ½ Street, Unit A
2026-PCCC-00186
Alexis Bailey
Request to operate a three-bedroom short term rental.
What the City’s Accela records say
The Bass Family Revocable Trust & Matthew Scott & Ashley Mezyk Brady (216 55th Street & 217 54th Street): “The Bass Family Revocable Trust & Matthew Scott & Ashley Mezyk Brady / Unimproved 15′ platted alley between 54th & 55th Streets in the 200 Block” Accela record 2026-PCCC-00192, Street Closure, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: No Response (October 19, 2026); Comprehensive Planning: Complete (October 19, 2026); Fire Marshal: Complete (October 21, 2026); City Attorney Real Estate: Complete (October 21, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Princess Anne Country Club (3800 Pacific Avenue): “Princess Anne Country Club / Change in nonconformity” Accela record 2025-PCCC-00182, Non-Conforming Use, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 8, 2026); Application Assignment: Assigned (October 8, 2026); Prepare App For Routing: Complete (October 8, 2026); Route App for Review: Complete (October 8, 2026); DSC Landscape Architect: Complete (October 14, 2026); Comprehensive Planning: Complete (October 21, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 22, 2026); City Attorney Land Use: Complete (October 16, 2026); Planning Admin Floodplain: Complete (October 22, 2026); DSC Stormwater: No Response (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Princess Anne Country Club (3800 Pacific Avenue): “Princess Anne Country Club / Modification of Conditions” Accela record 2025-PCCC-00181, Modification of Conditions, use: Outdoor Recreation Facility, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 8, 2026); Application Assignment: Assigned (October 8, 2026); Prepare App For Routing: Complete (October 8, 2026); Route App for Review: Complete (October 8, 2026); DSC Landscape Architect: Complete (October 14, 2026); Comprehensive Planning: Complete (October 21, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 22, 2026); City Attorney Land Use: Complete (October 16, 2026); Planning Admin Floodplain: Complete (October 27, 2026); DSC Stormwater: No Response (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Prosper Homes & Investments, LLC (1725 S Woodhouse Road): “Prosper Homes & Investments, LLC / The applicant requests to conditionally rezone this 87,090 square foot, split zoned parcel (R-20 & R-40) to Conditional R-20 and subdivide it into four (4) lots as depicted on the proffered Conceptual Subdivision Plan and construct four (4) new single family homes. We have proffered five (5) elevations of new homes which depict the quality and architectural features and style of the homes as well as exterior building materials which will be utilized on each of the four (4) new homes. / The newer neighborhood which abuts the subject property to the south as well as Cape Henry Collegiate School to the south and west are zoned R-20, as is the property across S. Woodhouse Road on the west side of Whittier Road. The property across S. Woodhouse Road on the east side of Whittier Road is zoned R-30 and the property immediately to the east is zoned R-40.” Accela record 2026-PCCC-00189, Conditional Change of Zoning, zoning R20, proposed R-20 Residential, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); DSC Landscape Architect: No Response (October 16, 2026); Comprehensive Planning: Complete (October 21, 2026); Fire Marshal: Complete (October 21, 2026); DSC PU Engineer: Complete (October 8, 2026); City Attorney Land Use: Complete (October 19, 2026); Planning Admin Floodplain: Not Applicable (October 23, 2026); DSC Stormwater: No Response (October 21, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Documents on the Accela record (5): CRZ 1725 S Woodhouse.pdf (Application*, uploaded September 30, 2026): “1725 S Woodhouse Road - CRZ Application”; Prosper Disclosure.PDF (Disclosure Statement*, uploaded September 30, 2026): “Prosper Homes & Investments - Disclosure Statement”; Conceptual Subdivision Plan_G-100 .pdf (Site Plan, uploaded September 30, 2026): “Conceptual Subdivision Plan - 1725 S Woodhouse Road”; S Woodhouse Home Depictions.PDF (Architectural Drawings, uploaded September 30, 2026): “S Woodhouse Road - Quality Home Depictions Models 1 - 5”; Check 240642.pdf (Other, uploaded October 9, 2026).
Sophia Ellis (523 20th Street): “Sophia Ellis / Requesting the permit to use this property as a short-term rental property. The home has 4 bedrooms and space for 4 cars and is located within the approved area for short-term rentals.” Accela record 2026-PCCC-00175, Conditional Use Permit, use: Short Term Rental, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); Fire Marshal: Complete (October 21, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Dmitriy Kirzhner (304 28th Street, Unit 301): No project description available. Accela record 2026-PCCC-00182, Conditional Use Permit, status In Review.
Greg Zinis (304 26th ½ Street, Unit A): “Greg Zinis / Conditional use permit to operate an existing condominium dwelling unit as a short-term rental, rented to transient guests for stays of less than 30 consecutive days. No structural modifications or changes to the exterior of the property are proposed” Accela record 2026-PCCC-00186, Conditional Use Permit, use: Short Term Rental, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 7, 2026); Application Assignment: Assigned (October 7, 2026); Prepare App For Routing: Complete (October 7, 2026); Route App for Review: Complete (October 7, 2026); Fire Marshal: Complete (October 21, 2026); City Attorney Land Use: Complete (October 19, 2026); DSC Subdivision Review: Complete (October 23, 2026).
Filed after the October 2026 report (not yet in a City report)
Record #
Application type
Project
Location
Filed
Status
2026-PCCC-00200
Modification of Conditions
Sophia Ellis
523 20TH ST, 23451
October 16, 2026
In Review
2026-PCCC-00201
Conditional Use Permit
Martin Yu
304 28TH ST, 110, 23451
October 19, 2026
Submitted
2026-PCCC-00205
Conditional Use Permit
Thomas G Davis and Nancy Rodio Davis
4005 ATLANTIC AVE, 118, 23451-2605
October 28, 2026
Submitted
What the City’s Accela records say
Sophia Ellis (523 20TH ST, 23451): “Sophia Ellis / Revision of the exception for alternative compliance filed 6/20/2018 regarding the section stating, “Each of the proposed Detached Houses shall not be used for any other principle use than one single-family dwelling.” The modification is requested to allow for short-term rental usage while maintaining the single-family dwelling requirement.” Accela record 2026-PCCC-00200, Modification of Conditions, status In Review.
City review (Accela, as of October 30, 2026): record status now In Review. No department review results posted yet. Other steps: Application Submittal: Complete (October 26, 2026); Application Assignment: Assigned (October 26, 2026); Prepare App For Routing: Complete (October 26, 2026); Route App for Review: Complete (October 26, 2026); DSC Landscape Architect: No Response (October 26, 2026); Fire Marshal: Complete (October 29, 2026).
Martin Yu (304 28TH ST, 110, 23451): “Martin Yu / Applying for a conditional use permit to operate home as a short term rental. It will be professionally managed by Host my Home, a short term rental management company.” Accela record 2026-PCCC-00201, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Thomas G Davis and Nancy Rodio Davis (4005 ATLANTIC AVE, 118, 23451-2605): “Thomas G Davis and Nancy Rodio Davis / Request to operate a studio short term rental.” Accela record 2026-PCCC-00205, Conditional Use Permit, status Submitted.
City review (Accela, as of October 30, 2026): record status now Submitted. No department review results posted yet.
Documents on the Accela record (2): Disclosure Statement.pdf (Disclosure Statement*, uploaded October 28, 2026); Application.pdf (Application*, uploaded October 28, 2026).
District 7
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 17, 2026
Presubmittal Meeting
Wienerschnitzel @ College Park Square
6501 College Park Square Shopping Center, District 7
A09-023716-PM
Ryan Shrader, MSA, P.C.
Ronald Frink
What the City’s Accela records say
Wienerschnitzel @ College Park Square (DSC file A09-023716-PM): “Wienerschnitzel @ College Park Square / Project involves the redevelopment of the existing fast food use to a similar use for Wienerschnitzel. Currently there exists shallow structures which will likely involve conflicts between the p[roposed stormwater system and necessary utility connections including an external grease trap.” Accela record 2026-DSC-023716, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 28, 2026. Comments from 8 departments: Fire Marshal (September 17, 2026); Comprehensive Planning (September 18, 2026); DSC Engineering (September 17, 2026); DSC Landscape Architect (September 17, 2026); DSC Project Coordinator (September 10, 2026); DSC PU Engineer (September 22, 2026); Zoning (September 22, 2026); PW Traffic Engineering (September 22, 2026). No comments from 2 departments: DSC Planner (September 23, 2026); PU Engineering (September 21, 2026). Other steps: Application Submittal: Received (September 8, 2026); Application Research: Complete (September 8, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 9, 2026).
Filed after the October 2026 report (not yet in a City report)
None so far.
District 8
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 17, 2026
Presubmittal Meeting
Mill Dam Project
Mill Dam Road, District 8
J04-023682-PM
Joe Bushey, Dynamic Commercial Real Estate Advisors
Melissa Kellam
September 29, 2026
Inquiry / Comment Review
Bangkok Garden Restaurant (Site Plan Submittal Requirements)
3824 Virginia Beach Boulevard, District 8
F07-020403-ES
Jason D. Seas, P.E., AES Consulting Engineers
Ronald Frink
What the City’s Accela records say
Mill Dam Project (DSC file J04-023682-PM): “Mill Dam Project / The applicant proposes to develop Unit 4B of the 1552 Mill Dam Road Condominium. The property was established as a two-unit commercial condominium. Unit 4A is the School of Rock Virginia Beach, a one-story, 3,874 SF building, and Unit 4B is currently an undeveloped building envelope. The proposal is a single one-story building for multi-tenant and personal service use. There are no previously approved or pending actions on the property and no approved site plan for Unit 4B.” Accela record 2026-DSC-023682, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, October 6, 2026. Comments from 7 departments: Fire Marshal (September 17, 2026); DSC Engineering (September 21, 2026); DSC Landscape Architect (September 17, 2026); DSC PU Engineer (September 17, 2026); Zoning (September 23, 2026); PU Engineering (September 17, 2026); PW Traffic Engineering (September 25, 2026). No comments from 2 departments: Planning Admin Current (September 14, 2026); DSC Planner (September 17, 2026). Other steps: Application Submittal: Received (September 1, 2026); Application Research: Complete (September 1, 2026); PM Submittal Review: Complete (September 2, 2026); Package Distribution: EDR Distribution (September 3, 2026).
Bangkok Garden Restaurant (Site Plan Submittal Requirements) (DSC file F07-020403-ES): “Bangkok Gardens / Erosion Control Site Plan for the Construction of New Restaurant” Accela record 2024-DSC-020403, Site Plan, E & S Only, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, December 20, 2024. Comments from 7 departments: DSC Engineering (December 18, 2024); DSC Landscape Architect (December 3, 2024); DSC Planner (December 9, 2024); DSC Project Coordinator (December 13, 2024); DSC PU Engineer (December 11, 2024); DSC Addressing (December 5, 2024); PU Engineering (December 10, 2024). Other steps: Application Submittal: Received (December 2, 2024); Application Research: Complete (December 2, 2024); PM Submittal Review: Complete (December 2, 2024); Package Distribution: EDR Distribution (December 3, 2024); Zoning: No Response (December 13, 2024).
Lot 70, Bay Island, Section Pool Addition (2144 Windward Shore Drive): “Lot 70, Bay Island, Section Pool Addition / New Pool” Accela record 2026-DSC-023101, Site Plan, Single Family RPA, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 1, 2026. No comments from 8 departments: DSC Engineering (September 1, 2026); DSC Landscape Architect (May 26, 2026); DSC Planner (May 28, 2026); DSC PU Engineer (August 17, 2026); DSC Addressing (May 18, 2026); Zoning (August 17, 2026); PU Engineering (May 19, 2026); PW Traffic Engineering (May 25, 2026). Other steps: Application Submittal: Resubmittal Received (August 12, 2026); Application Research: Complete (May 15, 2026); PM Submittal Review: Complete (August 12, 2026); Package Distribution: EDR Distribution (August 12, 2026); Final Utility Fee Sheet: Complete (September 1, 2026); Approval Letter: Letter Sent (September 1, 2026); Approval Stamping: Complete (September 1, 2026); Addressing: Complete (September 8, 2026); Final Action: Plan Released (September 8, 2026).
Lot 22, Broad Bay Colony (2504 Long Creek Drive): “Lot 22, Broad Bay Colony / New House and Pool” Accela record 2026-DSC-022932, Site Plan, Single Family RPA, status Closed.
City review (Accela, as of October 30, 2026): record status now Closed; review result Approved, September 17, 2026. No comments from 9 departments: DSC Engineering (September 15, 2026); DSC Planner (April 30, 2026); DSC Project Coordinator (August 3, 2026); DSC PU Engineer (August 3, 2026); DSC Addressing (April 16, 2026); Zoning (August 4, 2026); PU Engineering (July 30, 2026); PW Traffic Engineering (September 11, 2026); Planning Admin CBPA (April 29, 2026). Other steps: Application Submittal: Resubmittal Received (September 2, 2026); Application Research: Complete (April 13, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 9, 2026); Final Utility Fee Sheet: Complete (September 17, 2026); Approval Letter: Letter Sent (September 17, 2026); Approval Stamping: Complete (September 17, 2026); Addressing: Complete (September 18, 2026); Final Action: Plan Released (September 18, 2026).
Filed after the October 2026 report (not yet in a City report)
None so far.
District 10
Meetings with the Development Services Center
Date
Meeting type
Project
Location
DSC file #
Customer
City project coordinator
September 10, 2026
Presubmittal Meeting
Sentara Princess Anne Hospital, Parking Lot Expansion
2025 Glenn Mitchell Drive, District 10
G11-023693-PM
Laurence Benson, Kimley-Horn and Associates, LLC
PJ Scully
September 17, 2026
Presubmittal Meeting
Mini-Storage
1756 Rosemont Road, District 10
H10-023746-PM
Michael Gaddy, P.E., L.S., Gaddy Engineering Co.
PJ Scully
What the City’s Accela records say
Sentara Princess Anne Hospital, Parking Lot Expansion (DSC file G11-023693-PM): “Sentara Princess Anne Hospital Parking Expansion / The proposed project is a parking expansion consisting of 46 additional parking spaces, landscaping, and drainage infrastructure.” Accela record 2026-DSC-023693, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 21, 2026. Comments from 4 departments: Comprehensive Planning (September 10, 2026); Planning Admin Current (September 15, 2026); DSC Engineering (September 10, 2026); DSC Landscape Architect (September 10, 2026). No comments from 7 departments: Fire Marshal (September 10, 2026); Parks Planning Design Dev (September 14, 2026); DSC Planner (September 11, 2026); DSC PU Engineer (September 10, 2026); Zoning (September 11, 2026); PU Engineering (September 11, 2026); PW Traffic Engineering (September 17, 2026). Other steps: Application Submittal: Received (September 3, 2026); Application Research: Complete (September 3, 2026); PM Submittal Review: Complete (September 8, 2026); Package Distribution: EDR Distribution (September 8, 2026).
Mini-Storage (DSC file H10-023746-PM): “Mini-Storage at 1756 Rosemont Road / Mini-storage previously approved by CC for CUP. Proposed building location outside of existing easments, however, drive aisles and parking, utilities, and stormwater will need to be co-located in easements.” Accela record 2026-DSC-023746, Site Plan, Preliminary Concept Plan, status Revisions Required.
City review (Accela, as of October 30, 2026): record status now Revisions Required; review result Resubmittal Required, September 25, 2026. Comments from 8 departments: Fire Marshal (September 17, 2026); Comprehensive Planning (September 18, 2026); Planning Admin Current (September 24, 2026); DSC Engineering (September 17, 2026); DSC Landscape Architect (September 17, 2026); DSC PU Engineer (September 17, 2026); PU Engineering (September 17, 2026); PW Traffic Engineering (September 25, 2026). No comments from 3 departments: Parks Planning Design Dev (September 21, 2026); DSC Planner (September 23, 2026); Zoning (September 21, 2026). Other steps: Application Submittal: Received (September 11, 2026); Application Research: Complete (September 11, 2026); PM Submittal Review: Complete (September 11, 2026); Package Distribution: EDR Distribution (September 14, 2026); Planning Admin CBPA: No Response (September 25, 2026).
Filed after the October 2026 report (not yet in a City report)
None so far.
Compiled automatically by VBCCO from the City’s published report. Entries are as printed by the City; VBCCO has only grouped them by Council District and written dates out in full.
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.